Q2 FY27 · NSE: GHCLTEXTIL

Ghcl Textiles

Results filed 5 November 2026 · Market cap ₹1,243 crore · PE 9.1

GrowthGuidance maintainedTranscript read

Revenue
+31.8%
on a year ago
EBITDA
+148.0%
on a year ago
Profit to shareholders
+123.9%
on a year ago
EBITDA margin
20.5%
+3.6 pts on last quarter

GHCL Textiles delivered strong operational performance in Q2 FY27 with revenue growing 31% YoY to INR 446 crore and EBITDA margins reaching 20.6% on enhanced spreads and 99% capacity utilization. Reported PAT was impacted by an exceptional loss of INR 27 crore from an inventory fire at a rented godown, though claims are under investigation for recovery. The company committed INR 410 crore towards adding 58,368 spindles and solar capacity by FY28, while reducing net debt to INR 48 crore.

Ghcl Textiles Limited, Q2 FY27₹ crore, standalone
Q2 FY27Q1 FY27vs previous quarterQ2 FY26vs a year ago
Revenue446409+8.9%338+31.8%
Operating profit (EBIT)75.5753.82+40.4%21.95+244.3%
Operating margin17.0%13.2%+380 bps6.5%+1047 bps
Other income0.430.66−34.8%1.25−65.6%
Exceptional items−26.780–0–
Profit before exceptional items and tax74.4852.79+41.1%21.72+242.9%
Profit to shareholders35.8439.35−8.9%16.01+123.9%
Earnings per share (₹)3.754.12−9.0%1.68+123.2%

Source: Ghcl Textiles Limited’s filing to NSE, 5 November 2026. Operating profit is revenue less every expense except interest, so it leaves out other income and exceptional items. n.m.: not meaningful, because the earlier figure was zero or negative, or the latest one is a loss.

What stood out

  • EBITDA margins expanded significantly by 935 bps YoY to 20.6% in Q2 FY27 driven by higher spreads and product mix.
    SourceEBITDA came in at INR92 crores, up 141% with margin improving to 20.6% from 11.2% (Transcript original page 4 / Presentation original page 8)
  • One-time pre-tax exceptional loss of INR 27 crore (INR 20 crore post-tax) due to an inventory fire at a rented warehouse.
    SourceAll adjusted PAT figures mentioned above exclude the one-time exceptional loss of about INR27 crores on account of inventory lost in the fire incident at our rented warehouse in Tuticorin in August '26 (Transcript original page 4 / Presentation original page 8)
  • Net debt was reduced to INR 48 crore (0.03x net debt-to-equity) after repaying INR 74 crore of debt during H1 FY27.
    SourceDuring the half year, we repaid about INR74 crores of debt and now net debt is at INR48 crores, a net debt-to-equity of 0.03x (Transcript original page 4 / Presentation original page 10)

Guidance

MetricGuidancePeriod
EBITDA Margin
SourceI am saying that the Q3 margin, our view is that it will be closer to Q1 and maybe Q4 comes closer to Q2. So overall, I think somewhere between Q1 and Q2 is where our yearly margin would be (Transcript original page 9, Marshal Sonavane)
Q3 expected closer to Q1 (17.0%), Q4 closer to Q2 (20.6%), with full year between Q1 and Q2; long-term 15% to 18% by FY30FY27 / FY30
Spreads
SourceIn Q3, we sort of expect the spreads to come somewhere in between these two (Transcript original page 5, Marshal Sonavane)
Q3 spreads expected to settle between Q1 (INR 160/kg) and Q2 (INR 173/kg)Q3 FY27
Fabric Revenue Share
SourceWe sort of plan to end the year somewhere in the range of 16.5% to 17% from our overall fabric contribution (Transcript original page 6, Marshal Sonavane)
16.5% to 17% of total revenueFY27
Long-Term Revenue Target
Sourcekeep us on track towards our goal of INR2,500 crores revenue at a 15% to 18% EBITDA margin by FY30 (Transcript original page 5, Marshal Sonavane)
INR 2,500 crores revenue at 15% to 18% EBITDA marginFY30

Tailwinds

  • Expansion in yarn-cotton spreads from INR 160/kg in Q1 to INR 173/kg in Q2 supported EBITDA margins.
    SourceSo our spread in Q1 was 160 and Q2 it is at 173. So the spreads actually went up (Transcript original page 5, Marshal Sonavane)
  • Rising share of higher-margin fabrics in revenue mix, reaching 16.4% in Q2 FY27 compared to 11.4% in Q2 FY26.
    Sourcethe share of fabric in our revenue increased to 16% from 11% in the same quarter last year (Transcript original page 4 / Presentation original page 11)
  • High plant utilization at 99% with Meenakshi unit operating at full capacity.
    Sourcewe continue to operate at around 99% capacity utilization. Our Meenakshi unit has reached full capacity (Transcript original page 4, Marshal Sonavane)
  • Lower power costs supported by existing 65 MW captive renewable power infrastructure meeting ~70% of energy requirements.
    SourceIf you see, our power costs are lower primarily because of our own green energy installation (Transcript original page 13, Marshal Sonavane)

Headwinds

  • Cotton prices increased sharply towards the end of Q2 from INR 64,000 to INR 69,000 per candy, leading to buyer caution and near-term margin pressure.
    SourceDomestic cotton prices rose from around INR64,000 per candy to INR69,000 per candy during the quarter... higher raw material prices will take time to be absorbed and margins may see some near-term pressure (Transcript original pages 4 and 7, Marshal Sonavane)
  • Substantial inventory loss of INR 27 crore due to godown fire in Tuticorin.
    Sourceone-time exceptional loss of about INR27 crores on account of inventory lost in the fire incident at our rented warehouse in Tuticorin in August '26 (Transcript original page 4, Marshal Sonavane)
  • Reduction in government budgetary allocation for RoDTEP in FY27 from INR 182 billion to INR 100 billion.
    SourceRoDTEP extended till Dec 2026 at existing rates... but FY27 allocation cut to Rs 100Bn from Rs 182Bn (Presentation original page 15)

New businesses and products

capacity expansion · Board approved; site works on existing land

58,368 Spindles and 5 MW Rooftop Solar Expansion

Expected benefit
Generates annual revenue of INR 400 to INR 420 crores at an EBITDA margin of 14% to 15%
Risks
Execution delays, volatility in raw material prices
Timeline
End of FY28 (full benefits in FY29)
Investment
INR 410 crores (including margin money for working capital)
Sourcewe have received a board approval for an investment of INR410 crores which includes margin money on working capital requirements, towards adding 58,368 spindles along with 5 megawatts of rooftop solar (Transcript original page 4, Marshal Sonavane)

capacity expansion · Land allocated (56 acres) and payment made; retendering/DPR modification underway by SIPCOT

Fabric Processing Facility at PM MITRA Park Virudhunagar

Expected benefit
Forward vertical integration into woven and knitted fabric processing towards ready-to-cut fabrics
Risks
Infrastructure execution delays by park developer SIPCOT
Timeline
FY30 (delayed from earlier target of FY29)
Investment
INR 275 to INR 300 crores
SourcePM MITRA Park... We expect that project to sort of come in in FY30... Somewhere between INR275 crores to INR300 crores will be for our processing unit (Transcript original pages 5 and 7, Marshal Sonavane)

other · Under installation

11 MW Ground-Mounted Solar Project

Expected benefit
~INR 6 crores annual savings in power cost, taking total renewable capacity to 76 MW
Risks
Grid connectivity or commissioning delays
Timeline
Commissioning by end of Q3 FY27 (December 2026)
Investment
INR 32 crores
Source11-megawatt ground solar project is under progress and will be commissioned by end of Q3... outlay of Rs. 32 Cr; expected commissioning by Dec 2026. ~Rs. 6 Cr annual savings (Transcript original page 4; Presentation original page 13)

capacity expansion · Balance machines being received

Knitting Capacity Expansion (19 Additional Machines)

Expected benefit
Increases total knitting fleet to 40 machines, driving higher value-added fabric share
Risks
Downstream knitting demand absorption
Timeline
End of Q3 FY27; contribution from Q4 FY27
Investment
INR 7 to INR 8 crores
SourceOur planned knitting expansion will be completed in Q3 with receipt of balance machines... total 40 machines, by this Q3 end. So we can start seeing the result... from Q4 onwards (Transcript original pages 4 and 5, Marshal Sonavane)

Things to check

  • Exceptional items of ₹-26.8 crore in 2026-09
  • Operational risk highlighted by fire incident destroying INR 27 crore worth of cotton inventory in an offsite rented warehouse.
    Sourceone-time exceptional loss of about INR27 crores on account of inventory lost in the fire incident at our rented warehouse in Tuticorin in August '26 (Transcript original page 4, Marshal Sonavane)

How the call went

The call was concise, direct, and rich in operational and financial disclosures. Both the CEO and Directors offered straightforward explanations on margin sustainability, project schedules, and capital allocation.

Specific or vague
Management gave precise quantitative metrics on spreads (INR 160 vs INR 173), capex breakdowns (INR 410 cr, INR 300 cr, INR 32 cr, INR 7-8 cr), cotton prices (INR 64,000 to INR 69,000), and debt repayment (INR 74 cr).
Candour
Management was candid about the reasons behind the delay at the PM MITRA Park processing unit moving to FY30, the details of the inventory fire loss, and the expected moderation in Q3 margins.
The hard questions
Directly answered tough queries regarding potential delay in PM MITRA Park, state mega-project subsidy eligibility, rationale for a new spindle capex, and whether capital would be returned via buybacks.

What analysts pressed on

  • Potential spread compression in Q3 and sustainability of peak EBITDA margins.
  • Delays in the PM MITRA Park fabric processing capex shifting timeline from FY29 to FY30.
  • Growth visibility for next fiscal year given current ~99% capacity utilization.
  • Timeline and net recovery from the INR 27 crore fire inventory insurance claim.

Numbers against the story

The financial numbers reflect sharp operational performance, with revenue up 31% YoY and reported EBITDA up 141% YoY, matching management's narrative of strong operating leverage and high spreads. Reported PAT growth (+124%) was lower than adjusted PAT growth (+249%) due to the INR 27 crore exceptional fire loss. Management acknowledged that Q2's 20.6% EBITDA margin was a peak spread quarter and guided for moderation in Q3, demonstrating consistency between narrative and numbers.