Results filed 26 October 2026 · Market cap ₹3,525 crore · PE 19
GrowthGuidance maintainedTranscript read
Revenue
+116.0%
on a year ago
EBITDA
+178.5%
on a year ago
Profit to shareholders
+385.1%
on a year ago
EBITDA margin
68.8%
−1.4 pts on last quarter
Antelopus Selan delivered strong YoY growth with Q2 FY27 standalone net revenue rising 116% YoY to Rs 119.1 crore and PAT expanding to Rs 57.3 crore. Production averaged 1,656 boepd in Q2, with October production recovering to 1,950 boepd post the completion of the 10-well Bakrol campaign. The company signed DSF-IV contracts expanding into 7 discoveries in KG Onshore and maintains its exit guidance of 2,500 boepd for FY27.
Antelopus Selan Energy Limited, Q2 FY27₹ crore, standalone
Q2 FY27
Q1 FY27
vs previous quarter
Q2 FY26
vs a year ago
Revenue
119
131
−9.1%
55.13
+116.0%
Operating profit (EBIT)
68.72
81.63
−15.8%
13.63
+404.2%
Operating margin
57.7%
62.3%
−458 bps
24.7%
+3299 bps
Other income
8.1
1.19
+580.7%
2.32
+249.1%
Exceptional items
0
−10
–
0
–
Profit before exceptional items and tax
76.58
82.73
−7.4%
15.77
+385.6%
Profit to shareholders
57.29
54.32
+5.5%
11.81
+385.1%
Earnings per share (₹)
16.18
15.45
+4.7%
3.36
+381.5%
Source: Antelopus Selan Energy Limited’s filing to NSE, 3 November 2026. Operating profit is revenue less every expense except interest, so it leaves out other income and exceptional items. n.m.: not meaningful, because the earlier figure was zero or negative, or the latest one is a loss.
What stood out
Significant YoY top-line and earnings expansion driven by volume growth and high realizationsSourceRevenue from operations rose 116% YoY to Rs 121.7 cr, EBITDA tripled YoY to Rs 90.0 cr (reported) / Rs 83.0 cr (ex-one-off cess refund), and PAT grew nearly 5x YoY to Rs 57.3 cr from Rs 11.8 cr in Q2 FY26 (Transcript, original pages 7-8; Presentation, slide 7).
Award and signing of DSF-IV Revenue Sharing Contracts with the Government of IndiaSource"We have finally signed the RSCs or Revenue Sharing Contracts with the Government of India... on 22nd of October", adding 7 new discoveries in KG Onshore and acreage in Cambay Onshore (Pasunia 1 & 2, Ognaj, Uber) (Suniti Bhat, Transcript, original pages 3, 6; Presentation, slides 4, 6).
Bakrol 10-well drilling and fracking campaign completed, lifting production to over 950 boepdSource"Bakrol itself is set around October average production was around 950 barrels of oil equivalent plus... all 10 wells drilled and fracked" (Suniti Bhat, Transcript, original page 5; Presentation, slides 4, 5).
Guidance
Metric
Guidance
Period
Exit Production Rate FY27Source"We are hoping that this year we will exit at around 2,500 that is the guidance we are reasonably sure that we should be able to deliver" (Suniti Bhat, Transcript, original page 4; Presentation, slides 4, 5).
2,500 boepd exit
FY27 exit
Production Rate FY28 & FY29Source"Next year, that should be around 3,500 barrels. Thereafter, that should be 5,000 barrels" (Suniti Bhat, Transcript, original page 4; Presentation, slide 4).
3,500 boepd exit in FY28 and 5,000+ boepd onshore exit in FY29
FY28 - FY29
Capital Expenditure FY27Source"then Rs.220 crores, hopefully Rs.250 crores this year" (Suniti Bhat, Transcript, original page 4).
Hopefully Rs 250 crores
FY27
EBITDA MarginSource"So, hopefully, Raajeev will say it, but I think it should be around 70% mark... our endeavor is to maintain those numbers [>65%]" (Transcript, original pages 5, 9).
Endeavor to maintain >65% (targeted around 70%)
Full Year FY27
Tailwinds
Operational leverage due to high fixed-cost absorptionSource70% to 75% of the cost base is fixed, leading incremental barrels to cost significantly less; OPEX and handling costs fell from Rs 7.5 cr in Q1 FY27 to Rs 6.1 cr in Q2 FY27 (Transcript, original pages 8, 9, 12).
Favorable fiscal terms on Karjisan fieldSource"Karjisan has the best fiscals in our portfolio... statutory levies, in say Bakrol or Cambay are around 30% of top line vis-a-vis Karjisan, which is less than 5%... every barrel of Karjisan adds 2x the barrel of Bakrol" (Transcript, original pages 10, 12).
Zero debt and strong balance sheetSourceShareholder equity of ~Rs 780 cr, debt-free balance sheet, and roughly Rs 100 cr in cash, bank balances, and liquid investments (Raajeev Tirupati, Transcript, original page 8; Presentation, slide 8).
Headwinds
Sequential softening in realized commodity pricesSourceRealized oil price dropped QoQ from $95.3/bbl in Q1 FY27 to $88.2/bbl in Q2 FY27, and gas realization dropped from $10.33/MMBtu to $8.84/MMBtu (Raajeev Tirupati, Transcript, original page 7).
Temporary well productivity decline at KarjisanSource"One key well hit productivity issues, alongside natural declines" which lowered sequential volume slightly prior to targeted workovers (Presentation, slide 5; Suniti Bhat, Transcript, original page 7).
Gas evacuation constraints in AssamSourceLack of National Grid connectivity in Assam forces gas sales at a discount to APM, leaving monetization dependent on the delayed Duliajan-Numaligarh pipeline (Suniti Bhat, Transcript, original pages 17-18).
New businesses and products
capacity expansion · RSCs signed on October 22, 2026; FDPs and environmental work underway
Discovered Small Fields Bid Round 4 (DSF-IV) contract execution and expansion into KG Onshore & Cambay Onland
Expected benefit
Adds 7 discoveries in KG Onshore (positioning company in top 3 acreage holders in KG) and 4 in Cambay (Pasunia 1, Pasunia 2, Uber, Ognaj) to build medium-to-long term production towards 5,000+ boepd by FY29
Risks
High well costs in KG due to high-pressure/high-temperature conditions; need for separate establishment costs
Timeline
Short-term early production plan over next year; multi-year drilling campaign across next 3-4 years
Investment
Estimated at ~$10 million+ per well in KG (vs ~$1.5 million in Cambay)
SourceTranscript, original pages 3, 6, 11; Presentation, slides 4, 6
other · Formulating appraisal and development plan with JV partner after discovering light oil in TIPAM-1 zone during drilling of Duarmara-4Z
Duarmara Field light oil development (Assam-Arkan Basin)
Expected benefit
Enables early monetization via trucking oil to refiners without waiting for the delayed regional gas evacuation pipeline infrastructure (Duliajan–Numaligarh pipeline)
Risks
High well costs (~Rs 60-70 cr per well), geological complexities, and need for JV partner alignment
Timeline
Plan to be finalized over the next 5-6 months; potential production contribution starting next fiscal
Investment
~Rs 60-70 crores per well; Rs 100 crores already in CWIP towards Duarmara
SourceSuniti Bhat and Raajeev Tirupati, Transcript, original pages 7, 16-18, 19
other · Planning stage under 50:50 JV farm-in agreement with Synergia
Cambay Field appraisal drilling
Expected benefit
If successful, field could scale to be as large as or larger than Bakrol
Risks
Exploration/appraisal uncertainty and JV alignment
Timeline
Drilling 1 to 2 optionality wells planned in late Feb or early March (Q4 FY27)
Revenue up over 60%: check for an acquisition or a weak year-ago quarter
High concentration of capital in CWIP awaiting monetizationSourceRs 187 cr of CWIP (~24% of net worth), including ~Rs 100 cr stuck in Duarmara which is awaiting appraisal and monetization clarity (Transcript, original page 19; Presentation, slide 8).
Significant capex step-up required for KG Onshore fieldsSourceWell costs in KG Onshore are estimated at $10+ million per well compared to $1.5 million in Cambay, which may alter the debt-free balance sheet profile if funded via leverage or external capital (Suniti Bhat, Transcript, original pages 11-12).
How the call went
Management demonstrated strong operational clarity and candor in its maiden call, directly addressing financial nuances like CWIP capitalization, 100% tax expensing of drilling costs, and operational timelines.
Specific or vague
Management provided detailed operational metrics (field-level production numbers, well counts, realizations, and per-well capex metrics).
Candour
Management was candid regarding Karjisan's well decline, delays in fracking supply chains, high well costs in KG, and infrastructure roadblocks in Assam.
The hard questions
Analysts probed into high capital work-in-progress (Rs 190 cr), growing deferred tax liabilities, funding plans for KG, and pipeline bottlenecks in Assam, all of which management answered directly.
What analysts pressed on
Sustainability of >65% EBITDA margin amid fluctuating crude oil prices
High CWIP of Rs 190 cr and rising deferred tax liabilities
Funding requirement and capital allocation for high-cost KG Onshore wells ($10m+ each)
Gas monetization hurdles and infrastructure delays at Duarmara in Assam
Numbers against the story
Management emphasized that Q2 production was flat/slightly lower QoQ due to Karjisan decline and completed Bakrol workovers, which is fully reflected in reported standalone net sales dipping from Rs 131.0 cr to Rs 119.1 cr and average sales boepd moving from 1,705 to 1,656. While management highlighted ~70% EBITDA margins, reported EBITDA included a one-off cess refund of Rs 6.5 cr recognized in other income (normalized EBITDA margin of 68.8% vs headline 70.8%).
Figures: the company’s results filing with NSE, linked under the table.
Notes written by gemini-3.8-flash from the documents above on 15 November 2026. They summarise what the company said and can contain mistakes: check the source passage before relying on a point. Not investment advice.